Software Factory Budgets and Costs
Every ticket in the software factory runs under a dollar budget, and you see a cost estimate before you even dispatch it. This guide covers where that estimate comes from, what happens if a ticket’s plan needs more than its budget, and where to check spend. For the ticket lifecycle itself, see Software Factory Tickets.
The pre-dispatch estimate
When you fill out the ticket dialog, the dashboard fetches a cost estimate for that ticket before you click dispatch. It shows two numbers: a typical cost and a high-side cost, for example ”~$4.50 (up to $9.00)”.
- Typical is a central estimate built from recent, similar tickets that actually completed (historical ticket cost, once enough samples exist for your project or globally); it falls back to a calibrated static estimate when there is not enough history yet.
- High is a more conservative, higher percentile of that same distribution. It exists so the dashboard can also show your projected balance, that is, what your credit balance would look like after this ticket if it ran at the higher end, so you are not surprised mid-ticket.
Investigation tickets (read-only, no code changes) are priced far lower than build tickets (feature, fix, refactor, integration, verification, schema-evolution), since a build ticket’s graph does substantially more work.
This is a preview, not a hard cap: the actual bill is metered from real usage as the ticket runs, shown live on the ticket detail page.
The per-ticket budget
Every ticket also has a budget cap, a dollar ceiling for that ticket’s whole graph. You see it as the Budget field next to Cost on the ticket detail page. Most tickets never come close to it.
The cost gate: what happens if a ticket needs more
Occasionally, the plan for a ticket’s graph genuinely needs more than the ticket’s budget allows, for example a larger piece of work than expected once the agent has actually looked at your codebase. When that happens, the platform does not silently let the ticket overspend, and it does not silently fail it either. The ticket parks in an awaiting budget approval state and asks you to approve a specific, larger amount before anything more runs.
From the ticket detail page you get three options:
- Approve: requeues the ticket and re-plans it under the raised cap, resuming from where it left off.
- Reject: re-plan within cap: gives the ticket one bounded attempt at a smaller graph that fits the original budget instead.
- Reject and fail: terminally fails the ticket, with the decision recorded on it.
If you do not respond, the ticket does not stay parked forever: after a timeout it is treated the same as a decline and terminally fails, so a forgotten approval never quietly burns your credits by sitting open.
A budget exception is about the total size of the plan, not about something going wrong. It is your project’s way of asking “this is bigger than expected, is that still worth it to you?” before spending the money.
Seeing your spend
-
Per ticket: the ticket detail page shows live running cost (the Cost field) right next to its budget, updating as the ticket’s nodes run.
-
Per project: your project’s Usage view shows a spend-over-time chart you can split by model, pass, or category, plus a breakdown of recent spend and your highest-cost tickets. It is read straight from the same billing ledger that produces your invoice, so it always reconciles with what you are actually charged.
-
Per organization: open your account menu and choose Billing. One page shows your plan, your organization’s credit balance, this month’s spend and auto top-up first, with Add credits and the other main actions. Below are sections for the plan, the balance, the payment method, auto top-up, spending limits, usage and spend, Software factory spend and funding (where project money went, Fund now, low-balance alerts and funding history), billing notifications, invoices and transactions. Only organization owners and admins see this page. A member who opens Billing sees a short note that says who to ask.
Querying costs programmatically
If you are wiring the software factory into your own tooling or a Chipp agent, the platform exposes cost data over MCP: get_credit_balance for your current balance, and get_project_cost / get_ticket_cost for cost breakdowns by project or by ticket. See the Software Factory Tickets MCP guide for the full tool reference and how to connect.
Next steps
From here: Software Factory Ticket Dependencies for structuring multi-ticket work, or back to Software Factory Tickets for how a single ticket executes.
Ready to build it?
Tell Chipp what you want. Start free, or book a session and build it with our team.